Description
Boker Magnum Long Lead EDC Knife
The Magnum Long Lead EDC is a classic gentleman’s and gourmet pocket knife for everyday use. Its simple, slightly curved design is instantly appealing. The no-frills design also corresponds to its technical construction as a slip-joint knife, which has proven itself a million times over thanks to its ease of use and fewer components. The satin-finished blade made of 8Cr13MoV stainless steel is flat-ground, is opened by nail nick and does not lock. The lightly contoured handle scales made of textured G10 fit comfortably in the hand. With clip (tip-down/r).
- Type: Pocket Knife
- Lasergravur: Ja
- Brand: Magnum
- Overall Length: 18,40 cm
- Blade Length: 8,00 cm
- Blade Thickness: 2,70 mm
- Weight: 78 g
- Blade Material: 8Cr13MoV
- Handle Material: G10
- Opener: Nail Nick
- Opening: Manual
- Lock Type: Slipjoint
- Item Number: 01SC08









